Commercial Indianapolis, Indiana 10 days Industrial Property Owner

50,000 Sq Ft Warehouse Floor Coating: Fast-Cure Polyaspartic System with Minimal Downtime

1

Units Serviced

50%

Time Saved

$45,000

Cost Savings

50,000 Sq Ft Warehouse Floor Coating: Fast-Cure Polyaspartic System with Minimal Downtime

🔧 The Challenge

The warehouse floor had severe surface deterioration from 15 years of heavy forklift traffic, causing concrete dust that contaminated inventory and posed respiratory risks. The existing floor coating was peeling and creating trip hazards. The facility operated 24/5 and could only shut down sections for limited periods. Any coating system needed to withstand heavy forklift traffic, chemical spills, and thermal cycling while curing fast enough to minimize downtime.

💡 Our Solution

Auxi Services selected a polyaspartic coating system that cures in 2-4 hours versus 24-72 hours for traditional epoxy, allowing rapid return to service. The warehouse was divided into 5 zones, each completed sequentially. Surface preparation included diamond grinding and crack repair. A moisture mitigation primer was applied to address concrete moisture levels. The system included a base coat with anti-slip aggregate in traffic areas, a color coat for wayfinding, and a UV-stable topcoat. Temporary ramps allowed forklift access to completed zones while adjacent areas were worked on.

✅ The Outcome

Full 50,000 sq ft floor coating completed in 10 days. Facility maintained 70% operations throughout project. Polyaspartic coating withstood forklift traffic within 24 hours of application. Concrete dust eliminated entirely. Floor surface improved lighting reflection by 30%, reducing energy costs. Forklift tire wear reduced. Annual floor maintenance costs dropped by $12,000. Project completed $45,000 under budget.

Project Photos

Project photo 1

"Our floor was generating so much dust we were failing air quality inspections. Auxi came in, worked around our schedule, and had the entire 50,000 sq ft coated in 10 days. The polyaspartic system cured so fast we were running forklifts on it the next day. No more dust, no more issues."

— Karen Whitfield, Operations Director, Midwest Logistics Partners

Project Details

IndustryCommercial
LocationIndianapolis, Indiana
Timeline10 days
Client TypeIndustrial Property Owner
ServiceFlooring

Service Used

Multifamily Turn Services

Learn About This Service

Need similar results?

Let's talk about your property's needs.

View All Case Studies
AI Insights

AI-Powered Analysis

Our AI analyzed this project's results to surface key takeaways and actionable recommendations.

$45,000 under budget
Cost Analysis

Optimizing Capital Expenditure Through Efficient Execution

By leveraging a specialized polyaspartic system, we bypassed traditional methods to complete the project $45,000 under budget. Additionally, the enhanced durability of the coating reduced ongoing annual floor maintenance costs by $12,000, creating a long-term positive impact on facility operational expenditure.

50% reduction in downtime
Timeline Optimization

Accelerating Return To Service During Operations

Our zonal execution strategy allowed the facility to maintain 70% operations throughout the 10-day project window. The use of fast-cure technology reduced total downtime by 50%, ensuring that essential heavy-duty forklift traffic resumed almost immediately after application.

30% improved light reflection
Strategic Recommendation

Integrate High-Performance Coatings For Efficiency

Facilities should prioritize high-durability coating systems that offer functional benefits like increased light reflectivity, which reduced energy costs by 30% in this case. Investing in advanced surface materials prevents operational interruptions and proactively mitigates safety and maintenance risks before they escalate.

AI-generated analysis for reference only. Contact our team for a tailored operational assessment.