🔧 The Challenge

The senior living facility needed full interior renovations but could not relocate residents. Work had to be completed in occupied units with vulnerable elderly residents, requiring strict noise control, dust containment, and safety protocols. The facility also needed to maintain compliance with ADA and state healthcare regulations throughout construction.

💡 Our Solution

Auxi Services implemented a phased renovation plan completing 8-10 units at a time while relocating residents within the facility. Certified contractors with healthcare facility experience were deployed. Strict dust containment barriers, negative air pressure systems, and noise reduction protocols were enforced. Daily safety inspections ensured compliance with ADA, state healthcare, and OSHA standards. A dedicated resident liaison coordinated moves and addressed concerns in real time.

✅ The Outcome

All 80 units renovated 3 weeks ahead of schedule. Zero safety incidents or resident injuries. 100% ADA compliance achieved. Resident satisfaction survey showed 94% positive feedback on renovation process. Facility maintained full occupancy throughout project. Post-renovation property valuation increased by $1.2M.

Project Photos

Project photo 1Project photo 2Project photo 3

"Auxi's team was incredibly respectful of our residents. The phasing plan meant our seniors were never displaced from the building, and the communication was outstanding. We finished early and under budget — couldn't ask for more."

— Patricia Williams, Executive Director, Sunrise Senior Living

Project Details

IndustryHealthcare
LocationTampa, Florida
Timeline14 weeks
Client TypeSenior Living Operator
ServiceRenovation

Service Used

Punch List & Closeout

Learn About This Service

Need similar results?

Let's talk about your property's needs.

View All Case Studies
AI Insights

AI-Powered Analysis

Our AI analyzed this project's results to surface key takeaways and actionable recommendations.

$1.2M property valuation increase
Cost Analysis

Maximizing Asset Value Through Strategic Renovations

By completing the 80-unit turnover with efficiency, the facility realized significant operational savings while boosting the property's total valuation by over a million dollars. This demonstrates how targeted maintenance investment directly correlates to long-term asset appreciation.

18% faster project completion
Timeline Optimization

Accelerating Unit Turnovers While Maintaining Occupancy

Auxi's phased renovation model reduced project duration by 18%, allowing the facility to remain fully operational during construction. This precision in scheduling ensures that revenue-generating space is returned to service faster than traditional renovation methods.

94% resident satisfaction rate
Strategic Recommendation

Mitigating Operational Risk With Specialized Personnel

Using contractors certified in healthcare protocols ensures that strict safety and compliance standards are met without disrupting vulnerable populations. Facilities should prioritize specialized vendor management to guarantee resident satisfaction and maintain a perfect safety record.