Commercial Atlanta, GA 5 weeks Retail Property Owner

Retail Shopping Center Parking Lot Restoration and Repaving

1

Units Serviced

3 weeks ahead of holiday deadline

Time Saved

12 percent under budget

Cost Savings

Retail Shopping Center Parking Lot Restoration and Repaving

🔧 The Challenge

A retail shopping center with 15 tenants and 450 parking spaces had severely deteriorated pavement with widespread cracking, potholes, and drainage problems. The owner needed to repave without closing storefronts, and the project had to be completed before the holiday shopping season.

💡 Our Solution

Auxi developed a phased construction plan that divided the parking lot into 6 sections. Each section was closed, milled, repaved, striped, and reopened before the next section began. Temporary parking and pedestrian pathways were established. Work was performed overnight to minimize disruption. Drainage was redesigned and catch basins replaced to prevent future water damage.

✅ The Outcome

All 450 parking spaces were repaved in 5 weeks, 3 weeks ahead of the holiday deadline. No tenant reported lost revenue. The new drainage system eliminated standing water issues. The lot's lifespan was extended 15+ years. Cost was 12 percent under budget due to efficient phasing.

Project Photos

Project photo 1

"Auxi kept our stores open and our customers happy while completely rebuilding our parking lot. The phasing was flawless."

— Property Manager, Atlanta Retail Center

Project Details

IndustryCommercial
LocationAtlanta, GA
Timeline5 weeks
Client TypeRetail Property Owner
ServiceExterior

Service Used

Property Preservation Services

Learn About This Service

Need similar results?

Let's talk about your property's needs.

View All Case Studies
AI Insights

AI-Powered Analysis

Our AI analyzed this project's results to surface key takeaways and actionable recommendations.

12 percent under budget
Cost Analysis

Phased Restoration Reduces Total Project Overhead

By implementing a strategic phased construction approach, we successfully managed site logistics to avoid costly business interruptions. This efficiency resulted in significant financial savings, allowing the project to finish well under the initial capital expenditure forecast.

3 weeks ahead of deadline
Timeline Optimization

Accelerated Delivery Protects Crucial Holiday Revenue

Our team synchronized construction workflows to complete the site transformation three weeks ahead of the critical holiday season. This rapid execution ensured zero downtime for retail tenants, protecting their revenue during peak traffic periods.

15+ years added life
Strategic Recommendation

Integrate Drainage Solutions To Extend Infrastructure Lifecycle

Proactive property managers should combine surface restoration with essential drainage upgrades to maximize long-term asset value. Addressing underlying water issues prevented future degradation, successfully extending the pavement lifespan by over fifteen years.

AI-generated analysis for reference only. Contact our team for a tailored operational assessment.

Case Study — FAQs

Common questions about this type of project.