Retail Shopping Center Parking Lot Restoration and Repaving

🔧 The Challenge

A retail shopping center with 15 tenants and 450 parking spaces had severely deteriorated pavement with widespread cracking, potholes, and drainage problems. The owner needed to repave without closing storefronts, and the project had to be completed before the holiday shopping season.

💡 Our Solution

Auxi developed a phased construction plan that divided the parking lot into 6 sections. Each section was closed, milled, repaved, striped, and reopened before the next section began. Temporary parking and pedestrian pathways were established. Work was performed overnight to minimize disruption. Drainage was redesigned and catch basins replaced to prevent future water damage.

✅ The Outcome

All 450 parking spaces were repaved in 5 weeks, 3 weeks ahead of the holiday deadline. No tenant reported lost revenue. The new drainage system eliminated standing water issues. The lot's lifespan was extended 15+ years. Cost was 12 percent under budget due to efficient phasing.

Project Photos

Project photo 1

"Auxi kept our stores open and our customers happy while completely rebuilding our parking lot. The phasing was flawless."

— Property Manager, Atlanta Retail Center

Project Details

IndustryCommercial
LocationAtlanta, GA
Timeline5 weeks
Client TypeRetail Property Owner
ServiceExterior

Service Used

Property Preservation Services

Learn About This Service

Need similar results?

Let's talk about your property's needs.

View All Case Studies
AI Insights

AI-Powered Analysis

Our AI analyzed this project's results to surface key takeaways and actionable recommendations.

12 percent under budget
Cost Analysis

Achieving Significant Savings Through Phased Construction

By implementing a strategic six-section phasing plan, Auxi optimized resource allocation to avoid costly operational inefficiencies. This methodical approach resulted in a 12 percent reduction in total project expenditure compared to standard repaving methods.

3 weeks ahead of schedule
Timeline Optimization

Maximizing Revenue Through Efficient Project Delivery

Auxi utilized overnight scheduling and clear traffic management to ensure the project was completed three weeks before the peak holiday shopping season. This rapid execution ensured that retail storefronts maintained full access and revenue-generating capacity throughout the entire restoration.

15+ year lifespan extension
Strategic Recommendation

Long Term Asset Value Through Infrastructure Improvements

Property managers should prioritize proactive drainage redesign alongside surface repairs to mitigate long-term maintenance liabilities. This case demonstrates that addressing root causes like water accumulation can extend asset lifespan by over 15 years.