200-Unit Multifamily Turn Program for Institutional Investor
45
Units Serviced
53% reduction in vacancy time
Time Saved
$180,000
Cost Savings

🔧 The Challenge
A 200-unit multifamily community was acquired by an institutional investor with 45 units in turn status. The previous management had no systematic turn process, resulting in 28-day average vacancy time per unit and inconsistent quality across units. The investor needed a standardized, fast turn operation to maximize revenue.
💡 Our Solution
Auxi designed a standardized turn workflow with dedicated crews for paint, clean, repair, and make-ready phases. Each unit followed a 10-day turn schedule with quality checkpoints. A dedicated project manager coordinated all vendors through the Auxi platform, with photo documentation at each stage and automated scheduling for the next unit as soon as one was completed.
✅ The Outcome
Average vacancy time per unit dropped from 28 days to 13 days. All 45 units were turned within 60 days of program launch. The investor gained $180,000 in additional annual rental revenue from reduced vacancy time.
Project Photos

"Auxi cut our vacancy time in half. The standardized turn process means every unit is market-ready in under two weeks now — that's real money for a 200-unit community."
— Asset Manager, Institutional Real Estate Fund
Project Details
AI-Powered Analysis
Our AI analyzed this project's results to surface key takeaways and actionable recommendations.
Maximizing Asset Revenue Through Optimized Unit Turns
By systematically reducing vacancy time across 45 units, the investor captured significant unrealized rental income. This transition from reactive maintenance to a structured workflow directly converted lost time into a substantial financial gain for the property portfolio.
Accelerating Unit Turnover Through Standardized Workflows
Replacing inconsistent processes with a 10-day standardized schedule allowed the team to cut vacancy duration by more than half. Implementing clear quality checkpoints and automated scheduling ensures a predictable, rapid turnaround for every unit in the portfolio.
Scale Turn Operations With Integrated Vendor Oversight
Managing large-scale acquisitions requires centralized project management to maintain quality consistency across multiple trades. Utilizing a digital platform to track real-time progress and documentation is essential for hitting aggressive portfolio-wide completion targets.
AI-generated analysis for reference only. Contact our team for a tailored operational assessment.
Case Study — FAQs
Common questions about this type of project.